***** H Y D R A U L I C S M O D E L L I N G *****
RED Hydraulics Consultants Limited has professional engineers to provide the following services:
More than 50 hydraulic projects have been undertaken by the Consultant. Some of the projects are listed as follows:
Remarks:
DSD is the Drainage Services Department of the Hong Kong Special Administrative Region (HKSAR) Government. PM, DP, CM and SP are different divisions of DSD.
CEDD is the Civil Engineering and Development Depart of the Hong Kong Special Administrative Region (HKSAR) Government.
| Period | Project Title | Client |
| 2004-05 | Physical Hydraulic Model Tests for HK West Drainage Tunnel in Northern HK Island – Eastern Portal Structure and Main Drainage Tunnel | PM/DSD via Black & Veatch |
| 2005-07 | Physical & Mathematical Modeling Test for Sheung Wan Stormwater Pumping Station | DP/DSD |
| 2005-07 | Drainage Improvement in Tsuen Wan & Kwai Chung – Tsuen Wan Drainage Tunnel – Investigation Physical Modeling Test – Contract 1 | CM/DSD via Mott Connell Ltd. |
| 2005-06 | Pump Sump Modeling Tests for Sewage Pumping Stations at Kam Tin, Sha Po & Nam Sang Wai | SP/DSD |
| 2005-06 | Pump Sump Modeling Tests for Sewage Pumping Stations at Ma On Shan, Sai Kung Area 4 & Ting Kok Road | SP/DSD |
| 2007-08 | Physical Modelling Test for Proposed Ultra-Violet Disinfection Chamber at Shatin Sewage Treatment Works | SP/DSD |
| 2007-08 | Physical Modelling Test for Proposed Ultra-Violet Disinfection Chamber at Tai Po Sewage Treatment Works | SP/DSD |
| 2007-08 | Physical Modelling Test for Lai Chi Kok Transfer Scheme – Intake Structures, Outfall & Branch Tunnel | PM/DSD via Maunsell Consultants Asia Ltd. |
| 2008-09 | Physical Hydraulic Model Tests for Inter-Reservoir Transfer Scheme (IRTS) Water Tunnel between Kowloon Byewash Reservoir & Lower Shing Mun Reservoir | WSD via Black & Veatch |
| 2008-09 | Sewage Interception Scheme in Kowloon City – Investigation - Pump Sump Model Tests | SP/DSD via Atkins China Ltd |
| 2010 | Physical Hydraulic Modeling Test for Intake PFLR1 of HK West Drainage Tunnel | PM/DSD via Ove Arup & Partners HK Ltd |
| 2010-13 | Physical Model for Water Circulation Simulation on Improvement Works at Kai Tak Approach Channel/Kwun Tong Typhoon Shelter | CEDD via AECOM |
| 2010-11 | Drainage Improvement in Shuen Wan, Tai Po – Contract 1 – Pump Sump Model Test | Biwater Man Lee Ltd |
| 2010-11 | Design and Construction of Lai Chi Kok Transfer Scheme - Physical Hydraulic Modelling of Revised Intake F | Leighton-John Holland Joint Venture |
| 2011-12 | Physical Hydraulic Model Tests for Surface Roughness for Yuen Long Town Nullah (Town Centre Section) | DSD via Black & Veatch |
| 2011-12 | Physical Modelling of Sewage Treatment Works at Pillar Point Sewage Treatment Works | ATAL Engineering Ltd |
| 2011-12 | Physical Modelling for Main Pumping Station 2, Stonecutters Island Sewage Treatment Works, HK | KUBOTA Corporation |
| 2011-12 | Physical Modelling for Upper Tai Po River | DP/DSD via AECOM |
| 2012 | Physical Modelling of Pumping System for CLP Black Point Power Station Cooling Water System Enhancement | Black & Veatch |
| 2012-2015 | Physical Model Study for Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau II Estate | URS via Leader-Sunnic Joint Venture |
| 2013 | Physical Modelling for Upper Tai Po River – Planter at Bottom of Retaining Wall TR5 | DP/DSD |
| 2013-15 | Physical Modellings for the Inlet Structure at Cresent Garden and the Overflow Weirs beside the Storage Tank of Happy Valley Underground Stormwater Storage Scheme | DP/DSD |
| 2015 | Physical Modelling of Intake Box Culvert of Pumping System at Black Point Power Station | CLP Power HK Ltd |
| 2015-now | Physical Model Study for Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Prince Edward Road East | URS & Atkins China Ltd via Leader-Sunnic Joint Venture |
| 2019-now | Physical Model Tests for Proposed Intermediate Sewage Pumping Station (ISPS) and Existing Ma On Shan Sewage Pumping Station (MOSSPS) | SP/DSD |
| 2019-now | Proposal for Physical Modelling of Sewage Pumping Station for Dry Weather Flow Interceptor at Cherry Street Box Culvert | REC Engineering Co Ltd |
| Period | Project Title | Client |
| 2005-07 | Physical & Mathematical Modeling Test for Sheung Wan Stormwater Pumping Station | DP/DSD |
| 2019-now | Surge Analysis of Seawater Vertical Pipe Upgrading at GCR Main Building, HK | WSP (Asia) Limited |